Not Included In The Price
- Floor concrete and all kinds of excavation works.
- Floor and wall covering works (screed, ceramics, tiles, carpets, etc.)
- Obtaining the necessary official permits for the establishment of the building
- All kinds of insulation works between the building and the ground concrete.
- Telephone, computer and UPS installations.
- Electrical main distribution and all kinds of grounding lines.
- Electricity and Water Meter
- External connections outside the building. (Electricity, Waste Water and Clean water etc.)
- Heating and cooling installations (heater, air conditioner, etc.)
- Kitchen cabinets and bathroom cabinets
- Bathroom sanitary ware (Shower tray, toilet bowl, sink, faucets…)
- Transportation and assembly crew costs (food+drink+accommodation) will be calculated and added to the price.